Complete planning guide for a successful kitchen renovation
Home & ImprovementInitial kitchen assessment
Start day
Define kitchen remodel goals and needs
+3 days after start
Set detailed budget
+7 days after start
Research kitchen design trends
+10 days after start
Create kitchen layout plan
+14 days after start
Select cabinetry and storage solutions
+21 days after start
Choose countertop materials
+28 days after start
Select appliances
+35 days after start
Choose flooring material
+42 days after start
Select lighting fixtures
+45 days after start
Interview and select contractors
+50 days after start
Finalize project timeline
+55 days after start
Order materials and appliances
+60 days after start
Set up temporary kitchen
+65 days after start
Demo day preparation
+70 days after start
Final inspections and completion
+100 days after start
Using this template will create a new list with all the items shown above. You can rename the list, and optionally add due dates counted from a start date you choose.
16 tasks for a full kitchen renovation — layout, budget, appliances, trades, ordering, installation sequence, and sign-off. Kitchens are the most expensive room per square metre in most homes and the one where a sequencing mistake costs the most, because everything is fitted to everything else.
Where the sink, hob, and fridge sit determines the plumbing, the extraction, the electrics, and how the room feels to cook in for the next fifteen years. Changing it after the first fix is a rewrite of the whole job.
Spend real time here. Tape the layout out on the floor and walk it. Open imaginary doors. The classic errors — an appliance door that collides with a cabinet, no landing space beside the oven, a bin you can't reach with wet hands — are obvious on the floor and invisible on a plan.
Appliances and bespoke cabinetry have lead times measured in months, and a fitter booked for a week you have no worktop is a week you pay for anyway. Order as soon as the layout is final, and inspect everything on delivery rather than when it's needed — a damaged worktop discovered on fitting day stops the job.
First fix, plaster, cabinets, template, worktop, second fix, tiling. Worktop templating in particular can only happen once units are installed and level, then takes its own lead time. That gap is normal; plan to live without a worktop for a fortnight.
Six weeks without a kitchen is the realistic estimate. Set up a temporary arrangement — kettle, microwave, fridge somewhere else — before demolition.
Turn on due dates. Start ordering 10–12 weeks before the fit.